Campuses:
This shows you the differences between two versions of the page.
Next revision | Previous revision | ||
engineering:apr8_10 [2010/04/08 08:37] – created prisca | engineering:apr8_10 [2010/04/08 10:57] (current) – prisca | ||
---|---|---|---|
Line 1: | Line 1: | ||
- | | + | ===== Agenda for April 8, 2010 ===== |
- | | + | |
* Anything further needed before April 12? | * Anything further needed before April 12? | ||
* Sent around Schedule: posted in [[: | * Sent around Schedule: posted in [[: | ||
* Working Group Jobs. Next Milestone is the July 13-15 NSF review | * Working Group Jobs. Next Milestone is the July 13-15 NSF review | ||
- | === Water Shield Questions === | ||
- | == Make it real, talk to companies, do the engineering e.g. == | ||
- | * Door or labyrinth | ||
- | * Acrylic tunnel costs | ||
- | * Outer tank engineering | ||
=== Integration === | === Integration === | ||
== Refine cost and schedule == | == Refine cost and schedule == | ||
== Improve the conceptual design of the FAARM == | == Improve the conceptual design of the FAARM == | ||
== Implement information from other working groups == | == Implement information from other working groups == | ||
+ | === Water Shield === | ||
+ | == Make it real, talk to companies, do the engineering e.g. == | ||
+ | * Door or labyrinth | ||
+ | * Acrylic tunnel costs | ||
+ | * Outer tank engineering | ||
+ | == Develop infrastructure into shield (ductwork, electrical etc) == | ||
=== Screener Group === | === Screener Group === | ||
== Work with Yuen-Dat to compile results of survey == | == Work with Yuen-Dat to compile results of survey == |