Go to the U of M home page
School of Physics & Astronomy
Assay and Acquisition of Radiopure Materials

User Tools


engineering:faarm:wateri

Water Purification Infrastructure

  1. Description/Name:
  2. Planned use (be specific):
    1. Primary function:
    2. Temporary and permanent storage:
    3. Sample and detector handling:
    4. Jigs, fixtures, scaffolds, etc. necessary
    5. E & O activities
  3. Occupancy:
    1. Steady:
    2. Peak:
  4. Adjacencies (list/distance):
  5. Space size (gsf and/or WxLxH):
  6. Experiment Systems:
  7. Shielding:
  8. Floor load (PSF):
  9. Material handling (cranes, etc.)
  10. Finishes (walls/floor/ceiling):
  11. Casework:
  12. Storage:
  13. Furniture/Fixtures/Equipment (non-experiment):
  14. Mechanical:
    1. Environmental conditions:
    2. Clean class:
    3. Ventilation:
    4. Exhaust:
    5. Plumbing (domestic, waste, systems):
    6. Fire Suppression:
    7. Building Management System:
    8. Fume hoods:
    9. Chilled water
    10. Other:
  15. Electrical:
    1. Power (clean and dirty):
    2. Lighting:
    3. Low Voltage/Data/Communication:
    4. Fire Detection/Alarm:
    5. Other:
  16. Acoustical:
  17. Vibration Isolation:
  18. EMI/RFI Isolation:
  19. Hazardous materials:
  20. Special Consideration (expansion, etc.):
engineering/faarm/wateri.txt · Last modified: 2009/12/22 13:05 by ben