Line 15: Line 15:
   * Lee will talk to Dufrane. Need a very rough cost per area coverage for water shield   * Lee will talk to Dufrane. Need a very rough cost per area coverage for water shield
   * New Drawings need to go to DUSEL by Jan 29 - in time for review by larger collaboration for Feb 4 teleconf   * New Drawings need to go to DUSEL by Jan 29 - in time for review by larger collaboration for Feb 4 teleconf
-  * Prisca gone next week - Lee leads teleconference+
  
 ==== Discussion for this week ==== ==== Discussion for this week ====
  
-  * Summarize Lee and Bob's discussion wrt transfer of infrastructure into DUSEL format. +  * Summarize Lee and Bob's discussion wrt transfer of infrastructure into DUSEL format. 
 +  * Summary of DuFrane discussion or beginning of a water shield cost estimate 
 +    * Lee spoke with Lou of Dufrane earlier this week 
 +    * January 2009 concept was: 
 +      * 10-ft wide x 12-ft long x 9-ft high 
 +      * 8-ft thick shielding on four sides 
 +      * 5-ft thick shielding on top and bottom 
 +      * Structural (carbon) steel support structure 
 +      * Shield segments slide in and out to provide access 
 +      * Quote was $2.785 million 
 +    * January 2010 concept 
 +      * Much larger internal space 
 +      * Labyrinth access 
 +      * Similar shielding thickness 
 +      * Structural (carbon) steel support undesirable 
 +    * Dufrane unwilling to provide quote or even SWAG at current level of consideration 
 +    * Scaling calcs underway 
 +  * Surface bldg vs Shallow site.  re: decision by DUSEL not to develop 300' or 800' areas  
   * Revisit concept drawings - what is still missing, what needs to be changed    * Revisit concept drawings - what is still missing, what needs to be changed 
 +  * Items due in one week
 +    * Location of your experiment
 +      * for physics experiments, this means identification of either the mid-level (4850L) or deep-level (7400L) campus for installation of your experiment
 +    * Experiment installation drawing
 +      * Establish the required footprint
 +      * Identify all major subsystems
 +    * Requirements and hazard identification
 +      * Underground and surface spaces for fabrication, assembly, and other uses should be identified
 +      * Major hazards and handling and mitigation plans should be identified
  