====== Agenda for March 11, 2010 ====== | ====== Agenda for March 11, 2010 ====== | ||
+ | ==== No Teleconference Next Week - people are travelling. ==== | ||
+ | |||
* Go over new shortened drawings. | * Go over new shortened drawings. | ||
- | [[engineering: | + | For New Drawing click on newest version from [[engineering: |
+ | Reminder: Overhead crane already exists for each module. | ||
* Results of discussions between Bob Altes and Lee Petersen re Water Shield Engineering. [[engineering: | * Results of discussions between Bob Altes and Lee Petersen re Water Shield Engineering. [[engineering: | ||
- | * How do we move forward on costing? | + | * How do we move forward on costing? |
- | * Comments on the March 19/20 agenda | + | |
+ | DEADLINE 1: Prepare a List of the items you need to cost and send it to Lee and myself next week BEFORE the meeting (we can all use them to sharpen our discussion with colleagues) | ||
+ | |||
+ | DEADLINE 2: March 22. The Monday after the Collab Meeting. Send your results to Lee and he will collate for the Thursday | ||
+ | - Need cost for each type of screener x N (DongMing, Richard, Jodi) | ||
+ | - Additional shielding, cranes, (cryogens must be operations? | ||
+ | - Water shield: | ||
+ | - Water Purification system (Lee) | ||
+ | - Immersion Tank: Need best estimate for a scaled down CTF (Kara and experts she finds, like Richard.. who else?) | ||
+ | - Other Immersion tank needs: Clean room on top, LN blanket, ?? (Kara) | ||
+ | - Machine Shop (Lee, Prisca) | ||
+ | - Sample Rooms, Entry, offices, power, air, etc. (Lee - based on the drawings) | ||
+ | - Should we include NAA, Radiochemistry, | ||
+ | * Collaboration Meeting Details (end of NEXT WEEK!) [[: |