Agenda for March 11, 2010
No Teleconference Next Week - people are travelling.
For New Drawing click on newest version from here Discussion of “red lines” is found here
Reminder: Overhead crane already exists for each module.
DEADLINE 1: Prepare a List of the items you need to cost and send it to Lee and myself next week BEFORE the meeting (we can all use them to sharpen our discussion with colleagues)
DEADLINE 2: March 22. The Monday after the Collab Meeting. Send your results to Lee and he will collate for the Thursday March 25 teleconf.
Need cost for each type of screener x N (DongMing, Richard, Jodi)
Additional shielding, cranes, (cryogens must be operations?) and anything else related to running the screeners (DongMing, Richard, Jodi)
Water shield: Active Water + Gd includes PMTs (Lee, Bob, Prisca)
Water Purification system (Lee)
Immersion Tank: Need best estimate for a scaled down CTF (Kara and experts she finds, like Richard.. who else?)
Other Immersion tank needs: Clean room on top, LN blanket, ?? (Kara)
Machine Shop (Lee, Prisca)
Sample Rooms, Entry, offices, power, air, etc. (Lee - based on the drawings)
Should we include NAA, Radiochemistry, Surface bldg in our cost estimate or will we look too expensive?
Collaboration Meeting Details (end of NEXT WEEK!)
Meeting Page