====== Agenda for March 11, 2010 ====== | ====== Agenda for March 11, 2010 ====== | ||
+ | ==== No Teleconference Next Week - people are travelling. ==== | ||
+ | |||
* Go over new shortened drawings. | * Go over new shortened drawings. | ||
For New Drawing click on newest version from [[engineering: | For New Drawing click on newest version from [[engineering: | ||
+ | Reminder: Overhead crane already exists for each module. | ||
* Results of discussions between Bob Altes and Lee Petersen re Water Shield Engineering. [[engineering: | * Results of discussions between Bob Altes and Lee Petersen re Water Shield Engineering. [[engineering: | ||
- | * How do we move forward on costing? | + | * How do we move forward on costing? |
- | * Collaboration Meeting Details (end of NEXT WEEK!) [[meeting|Meeting | + | |
+ | DEADLINE 1: Prepare a List of the items you need to cost and send it to Lee and myself next week BEFORE the meeting | ||
+ | |||
+ | DEADLINE 2: March 22. The Monday after the Collab | ||
+ | - Need cost for each type of screener x N (DongMing, Richard, Jodi) | ||
+ | - Additional shielding, cranes, (cryogens must be operations? | ||
+ | - Water shield: | ||
+ | - Water Purification system (Lee) | ||
+ | - Immersion Tank: Need best estimate for a scaled down CTF (Kara and experts she finds, like Richard.. who else?) | ||
+ | - Other Immersion tank needs: Clean room on top, LN blanket, ?? (Kara) | ||
+ | - Machine Shop (Lee, Prisca) | ||
+ | - Sample Rooms, Entry, offices, power, air, etc. (Lee - based on the drawings) | ||
+ | - Should we include NAA, Radiochemistry, | ||
+ | * Collaboration Meeting Details (end of NEXT WEEK!) [[: |