Campuses:
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| engineering:mar11_10 [2010/03/11 08:16] – prisca | engineering:mar11_10 [2010/03/11 15:46] (current) – prisca | ||
|---|---|---|---|
| Line 1: | Line 1: | ||
| ====== Agenda for March 11, 2010 ====== | ====== Agenda for March 11, 2010 ====== | ||
| + | ==== No Teleconference Next Week - people are travelling. ==== | ||
| + | |||
| * Go over new shortened drawings. | * Go over new shortened drawings. | ||
| For New Drawing click on newest version from [[engineering: | For New Drawing click on newest version from [[engineering: | ||
| + | Reminder: Overhead crane already exists for each module. | ||
| * Results of discussions between Bob Altes and Lee Petersen re Water Shield Engineering. [[engineering: | * Results of discussions between Bob Altes and Lee Petersen re Water Shield Engineering. [[engineering: | ||
| - | * How do we move forward on costing? | + | * How do we move forward on costing? |
| + | |||
| + | DEADLINE | ||
| + | |||
| + | DEADLINE 2: March 22. The Monday after the Collab Meeting. Send your results to Lee and he will collate for the Thursday | ||
| - Need cost for each type of screener x N (DongMing, Richard, Jodi) | - Need cost for each type of screener x N (DongMing, Richard, Jodi) | ||
| - Additional shielding, cranes, (cryogens must be operations? | - Additional shielding, cranes, (cryogens must be operations? | ||
| - | - Water shield: | + | - Water shield: |
| - | - Water Purification system | + | - Water Purification system |
| - Immersion Tank: Need best estimate for a scaled down CTF (Kara and experts she finds, like Richard.. who else?) | - Immersion Tank: Need best estimate for a scaled down CTF (Kara and experts she finds, like Richard.. who else?) | ||
| + | - Other Immersion tank needs: Clean room on top, LN blanket, ?? (Kara) | ||
| + | - Machine Shop (Lee, Prisca) | ||
| + | - Sample Rooms, Entry, offices, power, air, etc. (Lee - based on the drawings) | ||
| + | - Should we include NAA, Radiochemistry, | ||
| * Collaboration Meeting Details (end of NEXT WEEK!) [[: | * Collaboration Meeting Details (end of NEXT WEEK!) [[: | ||
| - | |||