Campuses:
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
engineering:mar11_10 [2010/03/11 08:33] – prisca | engineering:mar11_10 [2010/03/11 15:46] (current) – prisca | ||
---|---|---|---|
Line 1: | Line 1: | ||
====== Agenda for March 11, 2010 ====== | ====== Agenda for March 11, 2010 ====== | ||
+ | ==== No Teleconference Next Week - people are travelling. ==== | ||
+ | |||
* Go over new shortened drawings. | * Go over new shortened drawings. | ||
For New Drawing click on newest version from [[engineering: | For New Drawing click on newest version from [[engineering: | ||
Reminder: Overhead crane already exists for each module. | Reminder: Overhead crane already exists for each module. | ||
* Results of discussions between Bob Altes and Lee Petersen re Water Shield Engineering. [[engineering: | * Results of discussions between Bob Altes and Lee Petersen re Water Shield Engineering. [[engineering: | ||
- | * How do we move forward on costing? | + | * How do we move forward on costing? |
+ | |||
+ | DEADLINE | ||
+ | |||
+ | DEADLINE 2: March 22. The Monday after the Collab Meeting. Send your results to Lee and he will collate for the Thursday | ||
- Need cost for each type of screener x N (DongMing, Richard, Jodi) | - Need cost for each type of screener x N (DongMing, Richard, Jodi) | ||
- Additional shielding, cranes, (cryogens must be operations? | - Additional shielding, cranes, (cryogens must be operations? | ||
- | - Water shield: | + | - Water shield: |
- Water Purification system (Lee) | - Water Purification system (Lee) | ||
- Immersion Tank: Need best estimate for a scaled down CTF (Kara and experts she finds, like Richard.. who else?) | - Immersion Tank: Need best estimate for a scaled down CTF (Kara and experts she finds, like Richard.. who else?) | ||
+ | - Other Immersion tank needs: Clean room on top, LN blanket, ?? (Kara) | ||
- Machine Shop (Lee, Prisca) | - Machine Shop (Lee, Prisca) | ||
- | - Rooms, power, air, etc. (Lee - based on the drawings) | + | - Sample |
+ | - Should we include NAA, Radiochemistry, | ||
* Collaboration Meeting Details (end of NEXT WEEK!) [[: | * Collaboration Meeting Details (end of NEXT WEEK!) [[: | ||
- |