Campuses:
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| engineering:mar11_10 [2010/03/11 08:55] – prisca | engineering:mar11_10 [2010/03/11 15:46] (current) – prisca | ||
|---|---|---|---|
| Line 1: | Line 1: | ||
| ====== Agenda for March 11, 2010 ====== | ====== Agenda for March 11, 2010 ====== | ||
| ==== No Teleconference Next Week - people are travelling. ==== | ==== No Teleconference Next Week - people are travelling. ==== | ||
| - | === Can we have a pre-meeting hobnob in Berkely on Thursday evening? Where are people staying? === | + | |
| * Go over new shortened drawings. | * Go over new shortened drawings. | ||
| For New Drawing click on newest version from [[engineering: | For New Drawing click on newest version from [[engineering: | ||
| Line 14: | Line 14: | ||
| - Need cost for each type of screener x N (DongMing, Richard, Jodi) | - Need cost for each type of screener x N (DongMing, Richard, Jodi) | ||
| - Additional shielding, cranes, (cryogens must be operations? | - Additional shielding, cranes, (cryogens must be operations? | ||
| - | - Water shield: | + | - Water shield: |
| - Water Purification system (Lee) | - Water Purification system (Lee) | ||
| - Immersion Tank: Need best estimate for a scaled down CTF (Kara and experts she finds, like Richard.. who else?) | - Immersion Tank: Need best estimate for a scaled down CTF (Kara and experts she finds, like Richard.. who else?) | ||