Go to the U of M home page
School of Physics & Astronomy
Assay and Acquisition of Radiopure Materials

User Tools


faarm:immersioni

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
faarm:immersioni [2009/12/22 11:16] benfaarm:immersioni [2009/12/22 13:01] (current) – removed ben
Line 1: Line 1:
-====== Ulta Sensitive Immersion Tank ====== 
- 
- 
-  - Description/Name:  Ultra-sensitive Immersion Tank at the 4850' level 
-  - Planned use (be specific): 
-     - Primary function:  A large-scale screener using either liquid scintillator or doped water to provide counting capabilities for large samples or materials 
-     - Temporary and permanent storage:  samples will be stored for varying periods within 
-     - Sample and detector handling:  sample handling done in sample prep area 
-     - Jigs, fixtures, scaffolds, etc. necessary: upper deck scaffolding; scaffolding for side port entries; crane (listed below) 
-     - E & O activities: grad student and postdoc training. No public use  
-  - Occupancy: 
-    - Steady:  0 
-    - Peak:  8 
-  - Adjacencies (list/distance): 
-  - Space size (gsf and/or WxLxH):  4 m diam x 4 m high (plus 1 m blanket) 
-  - Experiment Systems: 
-  - Shielding:  included 
-  - Floor load (PSF):  *approx. 1.19 tons per sq. m at center  (assumes Borexino-style AV of 1m radius containing 3.73 tons of LS cocktail 
-  - Material handling (cranes, etc.) 
-    - crane for lifting samples in and out (load?) 
-  - Finishes (walls/floor/ceiling): 
-  - Casework: 
-  - Storage: 
-  - Furniture/Fixtures/Equipment (non-experiment): 
-  - Mechanical: 
-     - Environmental conditions:  radon reduced air 
-     - Clean class:  2000 - Should there be a special, cleaner room on top? 
-     - Ventilation:  nitrogen cover gas system (goes here, or elsewhere?) 
-     - Exhaust: 
-     - Plumbing (domestic, waste, systems):  circulation of water and LS for cleaning and monitoring 
-     - Fire Suppression: 
-     - Building Management System: 
-     - Fume hoods: 
-     - Chilled water 
-     - Other:  
-  - Electrical: 
-     - Power (clean and dirty): for PMTs, DAQ 
-     - Lighting: 
-     - Low Voltage/Data/Communication:  
-     - Fire Detection/Alarm: 
-     - Other:  
-  - Acoustical: 
-  - Vibration Isolation:  not needed? 
-  - EMI/RFI Isolation: 
-  - Hazardous materials: 
-  - Special Consideration (expansion, etc.): 
  
faarm/immersioni.1261502201.txt.gz · Last modified: 2009/12/22 11:16 by ben