Campuses:
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revision | |||
naa_and_rnaa_screening [2009/12/22 12:53] – removed ben | naa_and_rnaa_screening [2009/12/22 15:52] (current) – old revision restored ben | ||
---|---|---|---|
Line 1: | Line 1: | ||
+ | * several HPGe on surface or 300' level dedicated to NAA. | ||
+ | * send samples out for irradiation | ||
+ | * sample transport issues and scheduling | ||
+ | * TRIGA accelerator proposed for NNBAR | ||
+ | * $200k additional cost will provide concurrent NAA irradiation and prompt gamma activation measurements on site | ||
+ | * thermal n flux 10< | ||
+ | * fast n flux = 10< | ||
+ | * Not ready for at least 4 years after DUSEL start |