This is an old revision of the document!
several HPGe on surface or 300' level dedicated to NAA.
send samples out for irradiation
sample transport issues and scheduling
TRIGA accelerator proposed for NNBAR
$200k additional cost will provide concurrent NAA irradiation and prompt gamma activation measurements on site
thermal n flux 1012 to 1013 n/cm2/s
fast n flux = 1011 n/cm2/s
Not ready for at least 4 years after DUSEL start