Campuses:
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
s4work [2009/12/22 12:56] – removed ben | s4work [2009/12/22 15:54] (current) – ben | ||
---|---|---|---|
Line 1: | Line 1: | ||
+ | ====== Working Page for the S4 Proposal Writing ====== | ||
+ | ===== Old S4 Proposal Teleconferences ===== | ||
+ | **The NOVEMBER 21 TELECONFERENCE will use 612-625-2003 and ask for S4 ** | ||
+ | // | ||
+ | |||
+ | |||
+ | // | ||
+ | |||
+ | // | ||
+ | |||
+ | |||
+ | * May 9 Teleconference: | ||
+ | * May 23 Teleconference: | ||
+ | * June 20 Teleconference: | ||
+ | * Define our Name: **AARM: Assay and Acquisition of Radiopure Materials** which has a more appropriate " | ||
+ | * Create 1st pass Budgetary information via a shared google spreadsheet. (see below) | ||
+ | * Create the Status Report slides for the DEDC. (see below) | ||
+ | * Continue to write text for the proposal, however, the status slides and the budgetary information will inform the structure of the text you write, so they have priority. | ||
+ | * Nov 14 Teleconference: | ||
+ | * Nov 21 Teleconference: | ||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | ===== DOCUMENT DETAILS of S4 Proposal ===== | ||
+ | |||
+ | * {{: | ||
+ | |||
+ | * {{: | ||
+ | |||
+ | * {{: | ||
+ | |||
+ | * {{: | ||
+ | |||
+ | * {{: | ||
+ | |||
+ | |||
+ | * {{: | ||
+ | |||
+ | * {{: | ||
+ | |||
+ | * [[http:// | ||
+ | |||
+ | * [[BudgetEst|Estimate of Entire Facility]] This link includes Kevin Lesko' | ||
+ | |||
+ | ===== S4 Elements and tasks ==== | ||
+ | |||
+ | **Clicking on the links gives a to-do list and names of people responsible** | ||
+ | - Introduction: | ||
+ | - Outline of the S5 more specifically | ||
+ | - ISE LBC at DUSEL://In this section, names were assigned to tasks by topic. | ||
+ | - [[Gamma screening]] - HPGe at both 300’ and 4850’ level. | ||
+ | - [[Alpha, Beta, and Rn counting]] - Commercial pre-screeners, | ||
+ | - [[ICP-MS Facility]]- provide sub-micro-Bq | ||
+ | - [[NAA and RNAA screening]] | ||
+ | - [[cold trace chemistry lab]] | ||
+ | - [[Whole body counting]]: Large ultrapure vat of liquid scintillation or pure water. | ||
+ | - [[Underground storage of ultra-pure materials]] - cryogens, water, noble liquids and gases, copper, lead and germanium. | ||
+ | - [[Underground ultra-pure material production]] facilities - electroformed copper, Kr removal, | ||
+ | - [[Neutron background]] measurements & technology | ||
+ | - Integration Tools | ||
+ | - articulate an integrated program | ||
+ | - share expertise (visiting experts? staffing and training?) | ||
+ | - identification of the larger user community (requires workshops) | ||
+ | - open database of material radiopurities, | ||
+ | - code repository and background studies (coordinated with ILIAS JRA-1) | ||
+ | - Coordinate existing and new facilities. | ||
+ | - Funds requested by S4 to make that S5 vision happen | ||
+ | - Project management engineer (1/4 time July08-May09? | ||
+ | - Computer support(manage integration website - all 3 yrs) | ||
+ | - Workshop support for integrating bio/ | ||
+ | - Travel (ILIAS meetings, workshop) | ||
+ | - Schedule for S5 and schedule for S4 funds to make S5 happen | ||
+ | - Management Structure for disbursing the S4 funds (Management structure for S5 too?) | ||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | |||
+ | ===== Ingredients ===== | ||
+ | This is a list in no particular order of what should go in the S4 and eventually the S5. One job we have at the meeting is to prioritize and add to this. Then we will have to cost it and understand if the scope is within the budget. | ||
+ | |||
+ | * Management Structure | ||
+ | * Project Engineer | ||
+ | * Integration Website | ||
+ | * Databases of Counted Materials | ||
+ | * Repository of Simulation Tools and codes | ||
+ | * Cosmo n, fission & alpha n | ||
+ | * Data base of backgrounds in all underground labs (in conjunction with ILIAS) | ||
+ | * Neutron (and background) monitoring (includes bkgd from possible reactor or accelerator) | ||
+ | * R&D coordination - group leaders for technology advancement? | ||
+ | * Coordination of non-DUSEL sites | ||
+ | * Synergy element: Form an " | ||
+ | * Bio/Geo is still defining their needs - establish integration and workshop program | ||
+ | * Workshop Program (how often? | ||
+ | * Integrate with ILIAS | ||
+ | * Outreach element: dedicate small portion of the production screening time to outside proposals | ||
+ | * Define DUSEL facility (see S1 white paper) | ||
+ | * Determine which parts of SUSEL become DUSEL and when | ||
+ | * Clear funding roadmap from SUSEL to DUSEL, EPSCoR " |