Working Page for the S4 Proposal Writing
Old S4 Proposal Teleconferences
The NOVEMBER 21 TELECONFERENCE will use 612-625-2003 and ask for S4
Teleconferences are Friday afternoon 1:30 pacific, 4:30 eastern
Dial: 1.800.379.6841 or 1.877.246.9080 (Toll Free USA and Canada)
Participant Conference Entry Code: 34479 (followed by the # key)
DOCUMENT DETAILS of S4 Proposal
FINAL Draft of the S4 Proposal (as of Jan 9, 2008 HAPPY NEW YEAR)
Text of the Draft S4 proposal (as of Nov 4, 2008)
Outline of the S4 proposal (as of May 26, 2008)
Text of the S4 proposal (as of June 20, 2008) This is more of a collection of your text, lightly edited by myself.
Slides sent in to the DEDC Internal Design Review (July 11, 2008)
Google Spreadsheet This is where we will build up our S4 budget. The 1,2,3 after the lines correspond to years. Feel free to add rows where missing and fill in only what you need to. If you do not want to put actual engineer cost down, just put the hours and we will figure it out. There is only limited equipment and R&D, so keep this in mind.
S4 Elements and tasks
Clicking on the links gives a to-do list and names of people responsible
Introduction: Overview of S5 vision
Outline of the S5 more specifically
ISE LBC at DUSEL:In this section, names were assigned to tasks by topic. More info can be found by clicking on the task. The main effort over the next 2 weeks is to identify the type and amount of engineering required to properly define the tasks, and also to provide extensive references to projects and people who have already done similar work - define the expertise
-
-
-
-
-
-
-
-
-
Integration Tools
articulate an integrated program
share expertise (visiting experts? staffing and training?)
identification of the larger user community (requires workshops)
open database of material radiopurities, assay capabilities
code repository and background studies (coordinated with ILIAS JRA-1)
Coordinate existing and new facilities.
Funds requested by S4 to make that S5 vision happen
Project management engineer (1/4 time July08-May09? Or is this infrastructure for DiGennaro?)
Computer support(manage integration website - all 3 yrs)
Workshop support for integrating bio/geo/other (1 per year? administrative support)
Travel (ILIAS meetings, workshop)
Schedule for S5 and schedule for S4 funds to make S5 happen
Management Structure for disbursing the S4 funds (Management structure for S5 too?)
Ingredients
This is a list in no particular order of what should go in the S4 and eventually the S5. One job we have at the meeting is to prioritize and add to this. Then we will have to cost it and understand if the scope is within the budget.
Management Structure
Project Engineer
Integration Website
Databases of Counted Materials
Repository of Simulation Tools and codes
Data base of backgrounds in all underground labs (in conjunction with ILIAS)
Neutron (and background) monitoring (includes bkgd from possible reactor or accelerator)
R&D coordination - group leaders for technology advancement?
Coordination of non-DUSEL sites
Synergy element: Form an “outside phyiscs” user community to use DUSEL and non-DUSEL sites
Bio/Geo is still defining their needs - establish integration and workshop program
Workshop Program (how often? broader than bio/geo)
Integrate with ILIAS
Outreach element: dedicate small portion of the production screening time to outside proposals
Define DUSEL facility (see S1 white paper)
Determine which parts of SUSEL become DUSEL and when
Clear funding roadmap from SUSEL to DUSEL, EPSCoR “interference”