vetoshield:jan13
January 13, 2010 Agenda
Engineering & Organization
Status and schedule of UCSB Soudan Visit. (Joel Sander)
Status of the additional Prop Tubes at Soudan (Jim Beaty)
Where will they go (Discussion)
With the addition of more floor space, should they go on the frame?
Or do we place them on floor (gaps, shadowing, etc)
Status of veto gas system (Joe Pastika)
Status of the DAQ
Data Storage - keep it running and take data for the future.
Analysis
Simulation
vetoshield/jan13.txt · Last modified: 2010/06/03 03:38 by prisca