4850 level, room with the roll-up door, contains network electronics, near a noisy filter/blower.
Status: tile installed, huts built. Need to finish network/power installations, need to define a place for electronics.
Install sheet: 4850b.pdf
Q330 serial | 0100000A1B9FC460 |
Q330 tag | 0926 |
Q330 IP | 204.114.29.37 |
Sensor type | STS-2 |
Sensor serial | 110033 |
Baler tag | 06300 |
GPS transceiver serial | DY5A10107 |
Switch label | 4850 SW 1 |
Date | Comments | Update by |
---|---|---|
11/19/2014 | Tanner installed the full station. Still need a cable for GPS timing. | Tanner |
11/20/2014 | GPS cable installed. Timing quality at 80%, not improving. | Tanner |
01/15/2015 | Moved electronics out of insulation hut and onto a table. Ran out of Great Stuff so we couldn't insulate the station better. However, this station is very noisy, so maybe it doesn't matter too much. Installed a new GPS cable with TTL to RS-232 conversion, timing quality at 100%. | Tanner |
02/02/2015 | Centered the seismometer remotely. | Tanner |
04/02/2015 | Used the Octans to align the seismometer. The seismometer was centered after the alignment. | Tanner |