Surface site near the Ross shaft.
Status: Installed concrete pad, retaining wall, insulation, and the solar panel post. Need to install the solar panel, radio, define a place for electronics.
Install sheet: ross.pdf
Q330 serial | 01000008E90A14F8 |
Q330 tag | 643 |
Q330 IP | 192.168.1.104 |
Sensor type | Guralp-3T |
Sensor serial | T34651 |
Baler tag | 05942 |
Wilan IP | 192.168.1.10 |
Date | Comments | Update by |
---|---|---|
11/19/2014 | Gary and Pat installed the full station. | Tanner |
11/22/2014 | Tanner and Pat fixed the station configuration. | Tanner |