Surface site at the Rhyolite Ridge, near the open cut. On Barrick property, need their permission to access it, and probably their guide. Steep dirt road, need a 4W drive in the winter. Could be very windy.
Status: Installed concrete pad, retaining wall, insulation, and the solar panel post. Need to install the solar panel, radio, define a place for electronics.
Q330 serial | 0100000A27B83253 |
Q330 tag | 823 |
Q330 IP | 192.168.1.120 |
Sensor type | STS-2 |
Sensor serial | 99149 |
Baler tag | 05207 |
Wilan IP | not recorded |
Date | Comments | Update by |
---|---|---|
05/20/2015 | Tanner, Gary, Daniel, and Pat installed the full station. | Tanner |
05/22/2015 | Gary noticed remotely that the battery was not charging, so we visited the station and ended up replacing the Y-cable which runs from the two solar panels to the power box. | Tanner |
Setup Sept 2014
Install May 2015