| - | Surface site at the Riolite | + | ====== RRDG ====== |
| + | |||
| + | Surface site at the Rhyolite | ||
| Status: Installed concrete pad, retaining wall, insulation, and the solar panel post. Need to install the solar panel, radio, define a place for electronics. | Status: Installed concrete pad, retaining wall, insulation, and the solar panel post. Need to install the solar panel, radio, define a place for electronics. | ||
| + | |||
| + | ==== Site information ==== | ||
| + | | Q330 serial | ||
| + | | Q330 tag | 823 | | ||
| + | | Q330 IP | 192.168.1.120 | | ||
| + | | Sensor type | STS-2 | | ||
| + | | Sensor serial | 99149 | | ||
| + | | Baler tag | 05207 | | ||
| + | | Wilan IP | not recorded | | ||
| + | |||
| + | |||
| + | ==== Site log ==== | ||
| + | ^ Date ^ Comments ^ Update by ^ | ||
| + | | 05/ | ||
| + | | 05/ | ||
| + | |||
| + | Setup Sept 2014 | ||
| {{groups: | {{groups: | ||
| - | {{groups: | + | {{groups: |
| + | |||
| + | {{groups: | ||
| + | |||
| + | Install May 2015 | ||
| + | |||
| + | {{groups: | ||
| + | |||
| + | {{groups: | ||
| + | |||
| + | {{groups: | ||
| + | {{groups: | ||