Campuses:
This is an old revision of the document!
Surface site near the Water Treatment Plant. On Lab property, close to water treatment facilities which could introduce some vibrations. On a slope, may be difficult to access in snow.
Status: Installed concrete pad, retaining wall, insulation, and the solar panel post. Need to install the solar panel, radio, define a place for electronics.
Install sheet: wtp.pdf