Campuses:
This is an old revision of the document!
Surface site near the Water Treatment Plant. On Lab property, close to water treatment facilities which could introduce some vibrations. On a slope, may be difficult to access in snow.
Status: Installed concrete pad, retaining wall, insulation, and the solar panel post. Need to install the solar panel, radio, define a place for electronics.
Install sheet: wtp.pdf
Q330 serial | 0100000B69D79318 |
Q330 tag | 1400 |
Q330 IP | 192.168.1.113 |
Sensor type | STS-2 |
Sensor serial | 109805 |
Baler tag | 06169 |
Wilan IP | 192.168.1.12 |
Date | Comments | Update by |
---|---|---|
01/22/2015 | Tanner, Gary, and Daniel installed the full station. We can't talk to the radio from the master. Gary thinks it may be a line-of-sight issue. | Tanner |
03/31/2015 | Tanner and Daniel installed a Yagi antenna and were able to make a connection to the master radio. Things seem to be working. | Tanner |
08/03/2015 | Seismometer centered remotely. | Tanner |
09/09/2015 | Seismometer centered remotely. | Tanner |
10/21/2015 | Seismometer centered remotely. | Tanner |