Go to the U of M home page
School of Physics & Astronomy
School of Physics and Astronomy Wiki

User Tools


groups:homestake:array:tpk

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Next revision
Previous revision
groups:homestake:array:tpk [2015/05/27 12:26] – created prestegardgroups:homestake:array:tpk [2015/06/01 11:40] (current) – [TPK] bowden
Line 3: Line 3:
 Install sheet: {{:groups:homestake:array:tpk.pdf|}} Install sheet: {{:groups:homestake:array:tpk.pdf|}}
  
 +Betty's house. Up around the right side of the house, farthest upper corner of her property/yard.
 +2 Batteries, since solar panel sky coverage not great.
 ==== Site information ==== ==== Site information ====
-| Q330 serial 0100000A27A010C9 +| Q330 serial 0100000A287DC025 
-| Q330 tag  | 851 +| Q330 tag  | 868 
-| Q330 IP  | 192.168.1.105 |+| Q330 IP  | 192.168.1.122 |
 | Sensor type  | STS-2 | | Sensor type  | STS-2 |
-| Sensor serial | 109832 +| Sensor serial | 110021 (recorded incorrectly on install sheet as 120011) 
-| Baler tag | 05943 | +| Baler tag | 07017 |
-| Wilan IP | 192.168.1.13 |+
  
-The sensor below was originally installed at this station, but was discovered to be faulty and was replaced on 4/3/2015The current station information is given above. +Note: no radio at this site.
- +
-==== Old site information ==== +
-| Sensor type  | Guralp-3T | +
-| Sensor serial | T31417 |+
  
 ==== Site log ==== ==== Site log ====
 ^ Date         ^ Comments ^ Update by  ^ ^ Date         ^ Comments ^ Update by  ^
-03/30/2015  | Tanner and Daniel installed the station.  Had problems with getting the seismometer working well and getting the Q330 to wake up the Baler.  Will watch the seismometer remotely and see if we need to replace it. | Tanner     | +05/17/2015  | TannerDanieland Gary dug the holes, set up the solar panel post, and poured the concrete. | Tanner     | 
-04/03/2015  | Tanner and Daniel replaced the Guralp with an STS-2.  Seems to be working better. Also figured out how to get the Q330 to wake up the Baler (need to set the interface to Serial 2 rather than Ethernet when using the Clie). | Tanner |+05/19/2015  | TannerDaniel, Gary, and Pat installed the sensor and data acquisition system| Tanner | 
 +| 05/22/2015  | Tanner and Pat visited the station to check on it and load a new Q330 configuration for standalone stations. | Tanner | 
 + 
 +{{groups:homestake/array:tpk1.jpg|photo 1}} 
 + 
 + 
 +{{groups:homestake/array:tpk2.jpg|photo 2}} 
 + 
 +{{groups:homestake/array:tpk3.jpg|photo 3}}
  
 +{{groups:homestake/array:tpk4.jpg|photo 4}}
groups/homestake/array/tpk.1432747596.txt.gz · Last modified: 2015/05/27 12:26 by prestegard