Campuses:
This shows you the differences between two versions of the page.
Next revision | Previous revision | ||
groups:homestake:meetings:20150205 [2015/02/05 09:06] – created mandic | groups:homestake:meetings:20150205 [2015/02/05 12:16] (current) – mandic | ||
---|---|---|---|
Line 1: | Line 1: | ||
Homestake meeting minutes, 02/05/15 | Homestake meeting minutes, 02/05/15 | ||
+ | |||
+ | Attending: Gary, Terry, Daniel, Jan, Noah, Vuk, Tanner, Pat, Nelson | ||
Homestake wiki: https:// | Homestake wiki: https:// | ||
Line 7: | Line 9: | ||
1) Homestake status | 1) Homestake status | ||
- | Vuk: during | + | Vuk: All instrumentation from PASSCAL has arrived, total 25 seismometers and digitizers. During |
+ | |||
+ | Gary: the radio problem is solvable. Probably need a higher antenna, maybe using a piece of pipe. Could also use a higher gain antenna. Not the configuration problem, probably not interference problem. Should ask PASSCAL for high gain antennas for this site and for the Riolite Ridge. They should have them on hand, could ask for this in a couple of weeks. May want to combine the shipment with something else, we need solar boxes (some went underground), | ||
+ | |||
+ | Daniel and Tanner to compile what else we need from PASSCAL. | ||
+ | |||
+ | Daniel/ | ||
2) Planning next visit: probably Mar 23 - Apr 3 | 2) Planning next visit: probably Mar 23 - Apr 3 | ||
Line 17: | Line 26: | ||
What we want to accomplish: | What we want to accomplish: | ||
- | * Build the 4850 station | + | * Build and install |
+ | * Install the two 2000ft stations. Power and network should be available by the time we arrive (network is currently down). | ||
+ | * Install the 1700 station nearest to Yates. Will not have network. | ||
+ | * Potentially install another station at 2000, further northwest. Discussions with SURF are in progress on this. | ||
+ | * Fix the radio issue with the water treatment plant station. | ||
+ | * Potentially install other surface stations, depending on weather. | ||
+ | * Improve the stability of the data flow. | ||
+ | |||
+ | Gary: for the highschool site, we should probably set up the station and deal with the communication later. Maybe this could be folded into our plan, maybe get students involved. | ||
+ | |||
+ | Vuk: should probably start talking with their IT people to see if we can set up the communication too. | ||
+ | |||
+ | Vuk summarized the proposed battery operation/ | ||
+ | |||
+ | Terry: may need different circuit breakers, all 4 chargers may be too much for a single circuit breaker. Will have to check with the mine. Also may have to put the batteries in tubs, but could stack them in a pyramid configuration. Also need the cable length from batteries to the station. | ||
+ | |||
+ | Gary: can trains carry 20 of these batteries? Should check with the mine. | ||
+ | |||
+ | Gary: may want to have a good hand truck to move them around at the site. | ||
3) Analysis of existing data | 3) Analysis of existing data | ||
- Estimation algorithms (Shivaraj, Eric, Noah) | - Estimation algorithms (Shivaraj, Eric, Noah) | ||
+ | Noah has found bugs in the Rayleigh wave recovery code, and has conducted a series of tests: https:// |