Go to the U of M home page
School of Physics & Astronomy
School of Physics and Astronomy Wiki

User Tools


handbook:facilities:home

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
handbook:facilities:home [2014/06/20 11:05] – [Cooling water hook-ups] crowellhandbook:facilities:home [2016/03/21 18:26] (current) crowell
Line 1: Line 1:
 +
 ====== Building Facilities ====== ====== Building Facilities ======
 +
 +====== Drawings ======
 +
 +Note:  These are the confirmed construction drawings for PAN as of 2012.  They do not include changes made during construction, the build-outs of shelled space or lab fit-ups.  Official changes during construction, including the build-outs of shelled space, are documented through proposal requests.  Paul Crowell may have these.  Lab fit-ups are not documented.  
 +
 +{{:handbook:facilities:volume_1.pdf|}} - This includes architectural drawings.\\  
 +{{:handbook:facilities:volume_2.pdf|}}  - This includes plumbing and mechanical drawings.\\
 +{{:handbook:facilities:volume_3.pdf|}}  - This includes electrical drawings.\\
 +{{:handbook:facilities:volume_4.pdf|}} - Cleanroom.\\
 +
  
 ===== Facilities problems ===== ===== Facilities problems =====
Line 6: Line 17:
  
   - Call 624-2900  (facilities management service desk) to report the problem. For PAN, the dispatcher may not know that the building exists yet - giving them the address may help (115 Union Street SE front door; 140 Harvard St SE dock)   - Call 624-2900  (facilities management service desk) to report the problem. For PAN, the dispatcher may not know that the building exists yet - giving them the address may help (115 Union Street SE front door; 140 Harvard St SE dock)
-  - Make sure they show up 
-  - If the situation can be considered fully resolved (let's say an overflowing toilet that is unclogged), then just forget about it.  If the situation may be related to a construction issue, such as a leak, then please notify me so I can forward the information.  
  
  
-===== Cooling water hook-ups =====+===== Cooling water hook-ups  (PAN) =====
  
 This sytem runs at much higher presssure than the system in Tate.  It can be 100 psi in the basement.    You must use properly rated hose and fittings.    Fiber reinforced flexible PVC with hose barb fittings is standard.  If you are using garden hose, it should be "heavy dut," and make sure it is rated for at least 125 psig.   If you want to use garden-hose style fittings (for example, if you detach cooling water lines frequently), DO NOT use the ones from the chemistry stockroom.    Buy the appropriate brass adapters from McMaster Carr.   If in doubt, please ask someone from Crowell or Dahlberg groups.  This sytem runs at much higher presssure than the system in Tate.  It can be 100 psi in the basement.    You must use properly rated hose and fittings.    Fiber reinforced flexible PVC with hose barb fittings is standard.  If you are using garden hose, it should be "heavy dut," and make sure it is rated for at least 125 psig.   If you want to use garden-hose style fittings (for example, if you detach cooling water lines frequently), DO NOT use the ones from the chemistry stockroom.    Buy the appropriate brass adapters from McMaster Carr.   If in doubt, please ask someone from Crowell or Dahlberg groups. 
Line 22: Line 31:
 4.  Most termination points have a bypass, which is currently open.   Depending on the impedance of your load, you should close this valve when you hook up your load.  Please leave the bypass on unused termination points OPEN.  4.  Most termination points have a bypass, which is currently open.   Depending on the impedance of your load, you should close this valve when you hook up your load.  Please leave the bypass on unused termination points OPEN. 
  
-From McMaster Carr: 
  
-Garden Hose-to-Tube Adapters +===== HVAC (Ventilation and temperature control) in PAN ===== 
-Male + 
-Female+NOTE:  The temperature and ventilation settings for PAN are all modified centrally.  DO NOT bother trying to set a thermostat it does nothing.  Depending on the time of day and day of the week, the system may run with a space unocupied or only 
 +when it is occupied.  If you need to change the settings in your office, please contact Shelley.  If you need to change the settings in your lab (for example to 24/7), please contact Jay Denny (denn0013@umn.edu) directly.  You will need to justify decoupling the HVAC from occupancy status, but it CAN be done. 
  
-Join hose to slip-on tube. Male connections are rigid. Female connections are swivel. Connectors require hose clamps (sold separately). 
  
-  +  
-  +
-  +
-Male +
-  +
-Female +
-For +
-Tube ID Max. +
-Pressure Max. +
-Temp. Pkg. +
-Qty.   Pkg. Pkg. +
-Qty.   Pkg. +
-Brass +
-3/8" 250 psi 195° F 4 70705T71 $14.81 2 70705T73 $8.87 +
-1/2" 250 psi 195° F 4 70705T81 15.50 2 70705T63 9.29 +
-5/8" 250 psi 195° F 2 70705T82 9.05 2 70705T64 11.70 +
-3/4" 250 psi 195° F 2 70705T83 9.25 2 70705T65 13.57 +
-1" 250 psi 195° F 1 70705T72 9.62 1 70705T74 8.64 +
-Stainless Steel +
-1/2" 250 psi 195° F 1 7712T84 32.68 1 7712T87 51.71 +
-5/8" 250 psi 195° F 1 7712T85 32.68 1 7712T88 53.29 +
-3/4" 250 psi 195° F 1 7712T86 33.30 1 7712T89 53.29+
  
  
handbook/facilities/home.1403280344.txt.gz · Last modified: 2014/06/20 11:05 by crowell