Telecon Notes June 20, 2018

Attendance: Shaul, Al, Jamie, Bill J.

Notes by: Shaul

Agenda

  • Review of TeamX slides
    • Instrument:
      • summary
      • systems
      • cost
      • optics
      • Mechanical/Configuration
      • Focal Planes and Detectors
      • Thermal
    • Mission:
      • summary
      • systems
      • instruments
      • cost
      • mission design
      • ACS
      • Power
      • Configuration
      • Mechanical
      • Propulsion
      • Thermal
      • CDS (computer and data system?)
      • SVIT (System Verification Integration and Testing?)
      • Telecom
      • Ground Systems
  • Report writing
    • schedule
      • First draft by Sept. 1 (first round of text + key figures)
      • October 1: 2nd draft
      • October 30: 3rd semi-final draft
      • Nov. 1: submit to external review
      • Nov. 21: receive external review comments
      • Nov. 21- Dec 15: implement external review changes
      • Dec. 15-31: final review
      • Dec. 31, 2018 - Submit
    • platform: GitHub

Notes

  • TeamX Slides:
    • Shaul suggests that subset of EC will review the TeamX slides. The goal is to fix and flag issue that may jump out for SOMA.
    • Are TeamX slides going to the decadal panel? Shaul thinks not, but the decadal can request them.
    • Jamie, Al suggest to add 'heritage' slides to the TeamX slides to increase SOMA's confidence
    • Bill will review the SVIT slides; Al, Jamie, Shaul will review the entire set
    • We will review comments by next week
  • Report:
    • Two different audiences: the cost estimators and the decadal panel. Balance is difficult.
    • Shaul suggested using additional narrative together TeamX slides to add material for SOMA.
    • Galactic science 5 pages is too long; Al, Jamie suggest to reduce to 3, and augment the 'mission' page allocation.