Go to the U of M home page
School of Physics & Astronomy
Probe Mission Study Wiki
private:teleconsnotes20180620

This is an old revision of the document!


Telecon Notes June 20, 2018

Attendance:

Notes by: qi

Agenda

  • Review of TeamX slides
    • Instrument:
      • summary
      • systems
      • cost
      • optics
      • Mechanical/Configuration
      • Focal Planes and Detectors
      • Thermal
    • Mission:
      • summary
      • systems
      • instruments
      • cost
      • mission design
      • ACS
      • Power
      • Configuration
      • Mechanical
      • Propulsion
      • Thermal
      • CDS (computer and data system?)
      • SVIT (System Verification Integration and Testing?)
      • Telecom
      • Ground Systems
  • Report writing
    • schedule
      • First draft by Sept. 1 (first round of text + key figures)
      • October 1: 2nd draft
      • October 30: 3rd semi-final draft
      • Nov. 1: submit to external review
      • Nov. 21: receive external review comments
      • Nov. 21- Dec 15: implement external review changes
      • Dec. 15-31: final review
      • Dec. 31, 2018 - Submit
    • platform: GitHub
private/teleconsnotes20180620.1529520638.txt.gz · Last modified: 2018/06/20 13:50 by hanany