Homestake Meeting Minutes, 10/06/2016 | Homestake Meeting Minutes, 10/06/2016 | ||
- | Attending: Levi, Vuk, Gary, Daniel, Victor | + | Attending: Levi, Vuk, Gary, Daniel, Victor, Pat, Terry |
Agenda: | Agenda: | ||
* Homestake array update | * Homestake array update | ||
- | * | + | * Daniel: removed all surface stations, everything in boxes in cold storage. Tried to pack everything so that in December the boxes can be simply added. Has inventory sheet, will add it to the wiki. Pallets are there (4 of them) in cold storage, two of them already used for surface stations (but can probably add to them). Pick them up with a forklift. Hope to bring the truck to the cold storage, via a different gate/road that may be even easier for the truck to go through. |
+ | * Gary: Connector came off the antenna at RR station, not sure how that happened. Probably wasn't installed right. | ||
+ | * Daniel: timing slowly drifted off at this station, got a timing lock at the decommissioning, | ||
+ | * Gary: for the archive they will flag it, but we should be able to do better, and make new miniSEED files that have the corrected data. Not sure how large the correction will need to be, probably of order 1 second. | ||
+ | * Daniel: for some applications where timing matters, maybe we just not use this station. Vuk/Gary agree. | ||
+ | * Daniel: Gary and Daniel have a copy of the baler data. | ||
+ | * Gary/Vuk: probably best to wait until December to get baler data for underground stations, and deal with it all then. | ||
* Planning the final decommissioning trip | * Planning the final decommissioning trip | ||
+ | * Personnel: Terry, Daniel, Pat, Vuk (probably in part). Gary cannot come, Victor also teaching. Ross can't come, has classes. | ||
+ | * Daniel: it is still not clear with Jaret what we should leave, concerned with fire hazards. Gary agrees, try to minimize the amount of stuff to remove. Vuk agrees. | ||
+ | * Vuk will talk to Jaret, aim to have details sorted out by the next meeting in 2 weeks. | ||
* Proposal: | * Proposal: | ||
* Sunday (eg Nov 27): arrive mid-day and access the storage to prepare a few boxes for Monday. | * Sunday (eg Nov 27): arrive mid-day and access the storage to prepare a few boxes for Monday. | ||
Line 20: | Line 29: | ||
* Some old stations have old equipment, as well as panels on the walls, so they may take more time to clean up. | * Some old stations have old equipment, as well as panels on the walls, so they may take more time to clean up. | ||
* Can we get motors on each level, question for SURF. | * Can we get motors on each level, question for SURF. | ||
- | |||
* Data analysis | * Data analysis | ||
+ | * Gary: looking at data from the land-streamer, | ||
+ |