Attendance: Amy, Shaul, Nick, Charles, Dave, Dan, Raphael
Notes by:
coordination with S4 and rest of community about report:
Dave: we are still in the process of determining what should be in
Shaul: there might be broader range of people who are interested in this
Charles: CMB-S4 is also preparing white paper for decal survey, there would be overlap
Shaul: CMB-S4 is preparing an augment, not planning to submit an independent site.
documents for next year, Dec. 2018 to Dec. 2019.
Charles:
Shaul: complementary paper was thought to be (with Julian) submitted with project paper, not with science paper.
Requirement vs current best estimate
thermal requirement and thermal loads
Temperatures of mirrors and stop: high confidence now.
excel sheets, current best estimate 0.61, slightly better than 0.65 reported in SPIE paper, requirement 0.85
draft report
outline, Shaul wants to go through, 1 month to produce texts
Sec 2.1, Shaul is committed to write 1.5 pages in a week or two
Dan: we agreed to work on 2.1 with Raphael
Raphael: no obstruction
The bullets are from STM, science trace matrix
Shaul: it would be unfortunate if PICO can do some science but we don’t highlight
(Ai) 2.1 and 2.2.1 in Two weeks
Shaul: by the end of Augst, we need a draft
2.2.1 and 2.2.2, three weeks from now, leave one week for EC summary
signal/noise
use updated numbers
STM are based on requirement
Run with both numbers
Writing texts in three weeks
what are the key figures going in, and how we want to improve them
text in place in 3 weeks. Forecasts could be later. Dave: we are still deciding what the key figures are within 3 pages with 5 topics.
2.4
Shaul: Douglas
Nick: 2 pages for “additional science”, now it’s 4 pages, needs to be trimmed; leave half page for other stuff, maybe 2 or 3 more communities; my stuff does not need half of page, can be short.
Shaul to send email to ?? talking about trimming down.
Shaul: flip 2.4, 2.5 before 2.3? move 2.3 after foreground and systematics?
Amy:
2.5. complementary
Charles did
Marshar Smithful?? during WorkShop, data with other data sets, Charles will contact him (AI)
Instrument and mission (Amy)
JPL challenge, we have a schedule
Instrument is , the mission a page of telescope, total page: 7
we have some draft content for spacecraft
Ch6, by the end of this month
Shaul:
Amy: JPL based template, like other Probes, happy to work on it to shrink pages.